老人黄色片_女人高潮叫床声音频_北条麻妃毛片_亚洲一区二区视频在线_国产无吗一区二区三区在线欢,免费看黄色三级三级,与子敌伦刺激对白播放免费,99黄视频

CN
Homepage?International Business?Overseas investment > What's New
Wind Power Projects in Germany
Release time:2023-03-13

In August 2016, CYPI joined hands with CTG Europe in acquiring 100% of the equity of BCP Lux, a wholly owned subsidiary of BCP Meerwind Cayman Limited, which is affiliated to the Blackstone Group and indirectly holds an 80% stake in WindMW GmbH. Since then, CYPI holds 30% of the shares of BCP Lux, which marks the first overseas investment project of CYPC.

The Meerwind Project is one of the largest offshore wind power projects that has been put into operation, the first offshore wind power project of Germany completely certified by Det Norske Verita, and is also the first offshore wind power project in the world which has received investment-level credit rating. The total installed capacity of Meerwind Project is 288 MW, with the annual power generation of about 1.3 TWh. The project can bring stable cash flow to CYPC during its operation period.